SNAPSHOT: Jetcharge worked with Powershift to power the final stages of their Kinetic Electric Bus Depot, using a mobile battery to enable staged commissioning and maintain full site operations until permanent power was connected.
Customer
Jetcharge
Application
Construction, EV and Machinery Charging
Location
Melbourne, VIC
THE BRIEF
Problem We Helped Solve
Jetcharge approached Powershift looking for a sustainable temporary power solution to support the final stages of their new Kinetic Electric Bus Depot. To allow the depot to operate and be commissioned following final stages of construction, they needed a reliable, emission-free and quiet temporary power source that could bridge the gap while waiting for their delayed permanent grid connection.
What Needed to be Powered
– Electric bus wash bays and associated equipment
– Office facilities and amenities
– Internal and external lighting
– General power requirements across the depot
Alternatives Assessed
An alternative approach to this scenario would have involved a 350kVa generator.
THE POWERSHIFT SOLUTION

The Enertainer Series are large-scale advanced battery systems, engineered to power entire construction sites and heavy industrial plant and equipment.
THE HIGHLIGHTS
Initially running on only 20A, the mobile battery unit increased to 63A as the project expanded. This capacity alone delivered extra benefits, such as cutting costs, removing the need for fuel storage, reducing emissions, and eliminating generator downtime.
No Fuel Storage Required
No fuel storage simplifies site and safety management.
Reduced Emissions
Supporting a cleaner, more sustainable site.
Generator Eliminated
Having no generator on site removed any downtime and maintenance concerns.
Significant Cost Savings
Compared to traditional generator power.