Customer


McNab

Application


Construction

Location


Kedron, QLD

Problem We Helped Solve


McNab needed a reliable power solution to run a 160A tower crane on a grid-constrained site with not enough mains supply, where space, noise and cost were key considerations. With total site demand of over 220A but only 80A of mains supply available, McNab needed a simple way to power the crane and run site power and amenities without exceeding that limited grid connection.

  • Powershift deployed 1 x P150 BESS, drawing on just a 16A input to power the site’s 160A tower crane. This split the site’s constrained 80A mains supply so that 63A powered site power and amenities directly, while the crane’s 160A peak demand was met from just 16A into the BESS.
  • The compact footprint of the unit suited the constraints of the Kedron site, without compromising on power delivery.
  • The system was backed by 24/7 monitoring to ensure all crane lifts were met reliably, giving McNab confidence in continuous performance throughout the build.

P150 units are highly compact, plug-and-play battery systems specially designed to power high peak electric machinery such as cranes, hoists, booms, welders and more.

The P150 delivered a compact, low-noise power solution for McNab’s Kedron site, eliminating the need for an oversized generator while running the site’s 160A crane from just 80A of available mains supply.