Customer


Paynter Dixon

Application


Construction

Location


Maroochydore, QLD

Problem We Helped Solve


Paynter Dixon required a temporary power solution for a 19-storey, 248-unit mixed-use
development but wanted to avoid the cost, maintenance burden and operational challenges
associated with running generators. The project required power across multiple locations on
site, with varying load demands throughout construction.

Alternatives Assessed


The site would have required at least 2x 350Kva Generators, alongside the 63A mains
connection.

  • The Powershift team developed a tailored temporary power strategy that showcased the flexibility of integrating multiple battery sizes to meet changing site demands
  • A Powershift Enertainer battery was deployed to support the site’s larger and more variable power loads. Its high-capacity energy storage enabled reliable operation while charging from a modest 63A mains grid connection.
  • To support a second crane and small dewatering operations, a P300 battery was deployed and actually charged from the Powershift Enertainer battery.
  •  24/7 monitoring and support by Powershift, provided real-time visibility of power usage and ensured peak demand was always met.

The Enertainer Series are large-scale advanced battery systems, engineered to power entire construction sites and heavy industrial plant and equipment.

The battery units successfully supported the various loads, delivering several key benefits to
Paynter Dixon: