SNAPSHOT: To overcome power constraints on a high-rise development, Powershift deployed two BESS units to manage the large versatile loads from a small 63A TBS.
Customer
Paynter Dixon
Application
Construction
Location
Maroochydore, QLD
THE BRIEF
Problem We Helped Solve
Paynter Dixon required a temporary power solution for a 19-storey, 248-unit mixed-use
development but wanted to avoid the cost, maintenance burden and operational challenges
associated with running generators. The project required power across multiple locations on
site, with varying load demands throughout construction.
Alternatives Assessed
The site would have required at least 2x 350Kva Generators, alongside the 63A mains
connection.
THE POWERSHIFT SOLUTION
The Enertainer Series are large-scale advanced battery systems, engineered to power entire construction sites and heavy industrial plant and equipment.
THE HIGHLIGHTS
The battery units successfully supported the various loads, delivering several key benefits to
Paynter Dixon: