Powering a commercial precinct through delayed grid connection

With grid connection delayed, Powershift deployed a hybrid BESS solution to keep a gym, swim school, dentist and GP clinic trading; cutting costs, noise and emissions compared to a standalone generator.

Client
QLD Developer
Location
Greenbank, QLD

The solution

  • Powershift deployed a POWRBANK MAX paired with a 200kVA genset that ran for a few hours a day to charge the BESS, creating a hybrid solution capable of meeting the site’s full peak demand while significantly reducing reliance on diesel.
  • The hybrid setup delivered continuous, clean and quiet power across all four tenancies, keeping the gym, swim school, dentist and GP clinic trading uninterrupted through the grid delay.
  • 24/7 monitoring and support from Powershift ensured the system powered all premises reliably.
  • Powrbank Max

    Powrbank Series

    Powrbank Max

    Max power, capacity and capability

    Continuous
    277kVA / 400A
    Peak
    330kVA / 480A
    Storage
    597kWh

The highlights

Project location

Greenbank, QLD

Case studies

Proven on site

Ready to make the shift?

Start your hire today.

Tell us about your site and your loads, and our team will come back to you with a battery solution sized to the job. Not sure what you need or where to start? Get in touch via the General Enquiries options below and a team member will walk you through it!

GENERAL ENQUIRIES

For general enquiries, reach out through our contact form and one of our team will be in touch as soon as possible. Alternatively you can email us on info@powershift.tech or call your local team:

Australia: 1300 705 793
New Zealand: 09 872 0328,

TECHNICAL SUPPORT

Are you an existing customer needing technical and/or product support? You can email us at, support@powershift.tech. Otherwise call your local team:

Australia: 1300 038 400
New Zealand: 09 871 8585

Get started

This field is for validation purposes and should be left unchanged.

Dates Equipment Required (if known)