Powering new housing developments through grid delays

Powershift delivered silent, reliable temporary power that enabled multiple new large housing developments to tenant homes on time, despite significant permanent power delays.

Client
Huff Group + AVID Property Group + CV Services + Stockland
Location
South East Queensland

The solution

  • Deployment of a single Powershift POWRBANK MAX battery unit across multiple development sites in South East QLD, sized and scoped to meet residential load demands and tenancy timelines.
  • Connection via 32–63A of available temporary building supply to maintain continuous trickle charging and allowing uninterrupted power to up to 55 new homes from a single unit.
  • 24/7 monitoring and support by Powershift ensured the battery delivered consistent, reliable power throughout the project, giving the customer peace of mind.
  • Powrbank Max

    Powrbank Series

    Powrbank Max

    Max power, capacity and capability

    Continuous
    277kVA / 400A
    Peak
    330kVA / 480A
    Storage
    597kWh
CV Services

As electrical contractors working across commercial construction, from residential developments through to high-rise and industrial projects, temporary power is part of almost every job. When our clients need site power before adequate permanent supply is available, it has to be reliable, easy to manage, and something we can hand over with confidence.

Powershift has been exactly that. Their mobile BESS units have powered everything from residential housing estates through to tower cranes and hoists, all from compact, plug-and-play units that are straightforward to integrate into our electrical scope.

The support behind the product is what stands out. Powershift helps us size the right unit, monitors performance 24/7, and is responsive whenever site conditions change. That takes the pressure off us and gives our clients confidence the power solution is in good hands, without adding to our workload. We’ll continue to look to Powershift on any project that requires temporary power.

The highlights

  • Satisfied TenantsEnabled developers to tenant and settle homes on schedule, avoiding delays caused by grid connection wait times.
  • Eliminated NoiseDelivered quiet, clean and emission-free temporary power compliant with residential environments.
  • Uninterrupted PowerResidents experienced reliable, uninterrupted power throughout their occupancy while the battery was on site.
  • Reduced CostsEliminated the need for diesel generators—reducing costs, noise, refuelling and maintenance.

Project location

South East Queensland

Case studies

Proven on site

Ready to make the shift?

Start your hire today.

Tell us about your site and your loads, and our team will come back to you with a battery solution sized to the job. Not sure what you need or where to start? Get in touch via the General Enquiries options below and a team member will walk you through it!

GENERAL ENQUIRIES

For general enquiries, reach out through our contact form and one of our team will be in touch as soon as possible. Alternatively you can email us on info@powershift.tech or call your local team:

Australia: 1300 705 793
New Zealand: 09 872 0328,

TECHNICAL SUPPORT

Are you an existing customer needing technical and/or product support? You can email us at, support@powershift.tech. Otherwise call your local team:

Australia: 1300 038 400
New Zealand: 09 871 8585

Get started

This field is for validation purposes and should be left unchanged.

Dates Equipment Required (if known)