Gowdie Management Group
Three generators replaced with a single compact BESS
Powershift deployed a single compact BESS unit, replacing what would otherwise have required three separate generators, to power two tower cranes, two hoists, a tower boom, and site amenities on Decode's space-constrained Cronulla site.
The challenge
Decode needed a reliable power solution to run a large demand from a very small grid supply and on a very tight site.
The requirements was to power over 700A of equipment – two tower cranes, two hoists, a tower boom and site general power – from only a 63A supply. With almost no space on site, the BESS unit also needed to be placed in the basement. Power availability on site also changed as the project progressed, at times dropping below the standard 63A TBS supply, so Powershift worked closely with the Decode team to monitor loads in real time and ensure the site never lost power.
What needed to be powered
- Tower crane 1 – 200A
- Tower crane 2 – 160A
- Hoist 1 – 100A
- Hoist 2 – 100A
- Tower boom – 63A
- Site general/amenities power – 80A
- Peak/max demand total – ~703A
The alternative
The alternative assessed was a genset-only approach comprising 300kVA, 200kVA and 60kVA generators.
The solution
- Powershift deployed 1 x P300 BESS unit, powering a DB feeding two tower cranes, two hoists, a tower boom and site general power from a 63A TBS input: a single unit, replacing what would otherwise have required three separate generators.
- The compact, fume-free unit made it a safer option for placement in the site’s basement, removing the risks associated with running a diesel generator in an enclosed space.
- The system was configured with the flexibility to accommodate additional loads as the project progressed. As power availability on site changed, Powershift worked closely with the Decode site team to reassess the BESS configuration, monitor loads in real time and ensure the site never lost power.
-
eGEN Series
eGEN P300
Small footprint. Big peak power.
- Continuous
- 300kVA / 400A
- Peak
- 316kVA / 440A
- Storage
- 85kWh
The highlights
- Removing Three GeneratorsFreed the site team to focus on other priorities instead of managing fuel logistics and ongoing maintenance.
- Safer Basement PlacementCompact, fume-free unit suited to an enclosed basement location.
- Cost SavingsOver $10k in monthly savings compared to the genset-only approach.
- Built-In FlexibilityConfigured to accommodate additional site loads if needed later in the project, along with the ability to adjust the mains input remotely as supply availability changed.
Project location
Cronulla, NSW
Case studies
Proven on site
Ready to make the shift?
Start your hire today.
Tell us about your site and your loads, and our team will come back to you with a battery solution sized to the job. Not sure what you need or where to start? Get in touch via the General Enquiries options below and a team member will walk you through it!
GENERAL ENQUIRIES
For general enquiries, reach out through our contact form and one of our team will be in touch as soon as possible. Alternatively you can email us on info@powershift.tech or call your local team:
Australia: 1300 705 793
New Zealand: 09 872 0328,
TECHNICAL SUPPORT
Are you an existing customer needing technical and/or product support? You can email us at, support@powershift.tech. Otherwise call your local team:
Australia: 1300 038 400
New Zealand: 09 871 8585